Parallel Operation of Large-Scale Battery Energy Storage Systems

Demonstration of large scale battery energy storage system operating in parallel.

Challenge:

An Energy Solutions Provider offering microgrid solutions needed flexible and scalable battery energy storage systems (BESS) to handle varying load conditions and requirements.

Solution:

Large-Scale Battery Energy Storage Systems Operating in Parallel

POWR2’s POWRBANK MAX 250.500/480 battery energy storage system (BESS) was identified as the ideal solution due to its ability to operate in parallel. A standalone POWRBANK MAX BESS offers 250kW and 500kWh. Up to four POWRBANK MAX BESS can run in parallel.

Set Up:

  • Four POWRBANK MAX large-scale BESS (250kW/500kWh/480V)
    • Combined Capacity: 2MWh (500kWh x 4)
    • Combined Output: 1MW (250kW x 4)
  • 1.2MW Diesel Generator: To charge the POWRBANK MAX units
Get The Full Technical Report
CONTACT US

Result:

The POWRBANK MAX 250.500 is a flexible power solution for use in microgrid applications. Use cases range from supporting peak demand, minimizing disruption during planned outages, providing off-grid power during grid maintenance, supporting communities with weak grid infrastructure, and more.

Benefits of POWRBANK MAX large-scale battery energy storage systems include:

  • Clean, efficient power that ranges from 250kW to 1MW under varying load conditions.
  • Scalable energy storage capacity from 500kWh to 2MWh.
  • The ability to support varying loads and high-demand applications
  • Time-Based Peak Shaving: Ability to set the active/reactive power limits for charging or discharging based on a defined schedule and/or set load conditions to optimize energy use.
  • Enhanced grid stability and reduced energy costs.

POWRBANK users should consult POWR2 engineering with all application details to confirm that POWRBANK MAX paralleling is an acceptable solution.

Want the Technical Details?